Projects
Completed (date not stated)ElectrificationTransformer substation between Awi and Okom-Ita, Akamkpa · AkamkpaThe transformer substation between Awi and Okom-Ita in Akamkpa rehabilitated. Transformer substation repaired and reconnected.Documented by Evidence Group from official papers1 source
Under constructionRoad ConstructionOban–Nsan Road, Akamkpa · AkamkpaOban–Nsan Road in Akamkpa is being built from scratch, and the first section is already asphalted. The road corridor cleared with heavy equipment. Engineers inspecting reinforced culverts. The first asphalted section, open to traffic.Documented by Evidence Group from official papers1 source
Looking to join the movement in Akamkpa? Evidence Group in Akamkpa.