Boki East-West Road

17km laterite road under construction. First 3km asphalted through forest stretch, with graded shoulders and gravel edging.

Ongoing • 3 km of 17 km asphalted

AsphaltedCoal tar don enter3 of 17 km (18%)

SourceWhere e come from: Six drone and road-level photos, three before and three after, labelled “Boki EastWest”.

What the photos showWetin di pictures show

  • Before: a red laterite track with deep wheel ruts and loose soil.
  • After, on the finished 3 km: a continuous asphalt surface through dense forest.
  • Graded shoulders on both sides, with gravel edging along the carriageway.
  • The remaining 14 km is still laterite and has not yet been asphalted.

Evidence on recordProof wey we get

  • Six drone and road-level photos, three before and three after, labelled “Boki EastWest”.
  • Road length (17 km) and progress (3 km asphalted) from Evidence Group's field report.