Evidence Group Cross River State: No Noise, Just Proof
All Progressives Congress (APC)
CompletedE don finishOgoja LGABridge Rehabilitation

Igoli/Abakpa (Aya) Bridge, Ogoja

Igoli/Abakpa bridge resurfaced. New asphalt deck, decorative side railings, crash barriers and solar streetlights working at night.

Asphalt deck photographed 24 June 2026 • Completed

SourceWhere e come from: Also shown as “Aya Bridge, Ogoja” in the Infrastructure Focus slides: the same GPS stamp, with before photos of the approach works.

What the photos showWetin di pictures show

  • Fresh asphalt across the full width of the bridge deck.
  • Decorative metal railings over a raised walkway on one side; concrete barriers on the other.
  • A row of solar streetlights lights the full length of the bridge after dark.
  • Yellow-painted crash barriers line the approach.

Evidence on recordProof wey we get

  • Also shown as “Aya Bridge, Ogoja” in the Infrastructure Focus slides: the same GPS stamp, with before photos of the approach works.
  • Day photo GPS-stamped at MQ6W+QCQ, Ogoja 550101 (6.66161°N, 8.79678°E), 2:47 PM on Wednesday 24 June 2026.
  • Night photo of the same bridge with the streetlights on.

Your ward needs you.

Join the youth structure organising across all 18 LGAs of Cross River State.