Evidence Group Cross River State: No Noise, Just Proof
All Progressives Congress (APC)
OngoingWork dey go onObudu LGAAirport Construction

Obudu Cargo Airport

Cargo airport under construction. Control tower glazed and still in scaffolding; terminal buildings up with glass fronts; site paths and planting under way.

Ongoing • Construction in progress

SourceWhere e come from: Four site photos labelled “Ongoing: Obudu Cargo Airport”.

What the photos showWetin di pictures show

  • A tall control tower with a glazed cab and rooftop rail, still wrapped in scaffolding.
  • Low terminal buildings with stone-clad walls, dark slatted fascias and full-height glass.
  • A second, smaller tower on the building beyond.
  • Concrete paths with kerbs and young palms planted along them.
  • Graded red earth in front of the terminal; timber, sand and gravel still on site.

Evidence on recordProof wey we get

  • Four site photos labelled “Ongoing: Obudu Cargo Airport”.

Your ward needs you.

Join the youth structure organising across all 18 LGAs of Cross River State.