OngoingWork dey go onOgoja LGARoad Construction
Stadium Road, Ogoja
Stadium Road being asphalted with concrete side drains. Finished stretch has centre-line and edge markings; roller still working further along.
Ongoing • Asphalting and drainage works in progress
SourceWhere e come from: Two road-level photos labelled “Stadium Road, Ogoja”: one of the finished stretch, one of works in progress.
What the photos showWetin di pictures show
- Finished stretch: smooth asphalt with a dashed white centre line and white edge lines.
- Concrete side drains with slab covers at the entrances to roadside shops.
- Grassed verge on the finished section.
- Work in progress: fresh asphalt being compacted by a road roller, with workers on site.
- A new side drain still open beside the freshly laid surface.
Evidence on recordProof wey we get
- Two road-level photos labelled “Stadium Road, Ogoja”: one of the finished stretch, one of works in progress.
- Before and after photos of “Old Stadium Road”: Infrastructure Focus slides.