Projects
Completed (date not stated)School BuildingSt. Peter's Primary School, Kakwagon, Irruan · BokiNew 4-classroom block built at St. Peter's Primary School, Kakwagon, Irruan. Roofed, painted and in place. One block of four classrooms, completed with a blue roof and painted walls. Front veranda running the full length of the block. Grassed compound in front of the building.Documented by Evidence Group from official papers5 sources
Under constructionRoad ConstructionBoki East-West Road · Boki17km laterite road under construction. First 3km asphalted through forest stretch, with graded shoulders and gravel edging. Before: a red laterite track with deep wheel ruts and loose soil. After, on the finished 3 km: a continuous asphalt surface through dense forest. Graded shoulders on both sides, with gravel edging along the carriageway. The remaining 14 km is still laterite and has not yet been asphalted.Documented by Evidence Group from official papers2 sources
Looking to join the movement in Boki? Evidence Group in Boki.