Projects
Completed (date not stated)Library RenovationState Library, Calabar · CalabarState Library renovated and commissioned. New glass façade, restocked bookshelves, reading halls and study workstations. Before: a weathered, stained façade with broken louvres. After: a refurbished glass curtain-wall front and repainted tower block. Inside: new white shelving stocked with books. A bright reading hall with full-height windows and desks. Rows of partitioned study workstations with office chairs. Commissioning ceremony on site, with stage and red carpet.Documented by Evidence Group from official papers1 source
Under constructionAirport ConstructionObudu Cargo Airport · ObuduCargo airport under construction. Control tower glazed and still in scaffolding; terminal buildings up with glass fronts; site paths and planting under way. A tall control tower with a glazed cab and rooftop rail, still wrapped in scaffolding. Low terminal buildings with stone-clad walls, dark slatted fascias and full-height glass. A second, smaller tower on the building beyond. Concrete paths with kerbs and young palms planted along them. Graded red earth in front of the terminal; timber, sand and gravel still on site.Documented by Evidence Group from official papers1 source