Projects
Completed (date not stated)Bridge ConstructionYellow Duke mini bridge, Calabar South · Calabar SouthA choked, rubbish-filled crossing in Calabar South replaced with a clean concrete bridge and wide road. Before: a narrow crossing over a blocked channel. After: a new concrete bridge with guard walls.Documented by Evidence Group from official papers1 source
Completed (date not stated)Bridge RehabilitationIgoli/Abakpa (Aya) Bridge, Ogoja · OgojaIgoli/Abakpa bridge resurfaced. New asphalt deck, decorative side railings, crash barriers and solar streetlights working at night. Fresh asphalt across the full width of the bridge deck. Decorative metal railings over a raised walkway on one side; concrete barriers on the other. A row of solar streetlights lights the full length of the bridge after dark. Yellow-painted crash barriers line the approach.Documented by Evidence Group from official papers3 sources
Completed (date not stated)DrainageChamley Channel drain and culvert, Calabar South · Calabar SouthA new drain and culvert on Chamley Channel to carry flood water away from homes in Calabar South. During: the channel being excavated and lined. After: the covered culvert with the road open above it.Documented by Evidence Group from official papers1 source
Completed (date not stated)EquipmentNew road construction equipment for the Ministry of Works · Cross River StateTrucks, rollers, loaders and low-bed trailers bought, so the state can build and maintain its own roads. Haulage trucks and low-bed trailers. Road rollers and wheel loaders.Documented by Evidence Group from official papers1 source
Completed (date not stated)Erosion ControlMarina Resort slope, Calabar · CalabarA collapsing slope at Marina Resort held back with gabion walls before it could take more land. Before: an eroded, collapsing bank. Gabion (stone-basket) walls built to hold the slope. After: the slope stabilised and growing back.Documented by Evidence Group from official papers1 source
Completed (date not stated)Junction UpgradeNdok Junction, Ogoja · OgojaNdok junction upgraded. Paved median with planters and white stone bed, central streetlight pole, fresh yellow lane markings. A new raised median with yellow kerb markings. White stone bed with planters down the middle. A double-arm streetlight pole on the median. Fresh yellow lane lines on both carriageways.Documented by Evidence Group from official papers2 sources
Completed (date not stated)Road AsphaltingNyong Edem Street, Calabar · Calabar MunicipalNyong Edem Street asphalted. Fresh tarmac with a dashed white centre line, solid yellow edge lines and kerbs. New asphalt laid along the street between homes. Dashed white centre line and solid yellow edge lines. Kerbs along the road edge and a concrete drain beside it.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road ConstructionEtiyin Abasi Street by Mount Road, Calabar · CalabarA bushy footpath on Etiyin Abasi Street is now a paved street families can drive on. Before: an overgrown footpath with no road. After: a paved street curving through the neighbourhood.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road ConstructionHon. Justice I. Ofem Road along CICC, Calabar · Calabar MunicipalJustice Ofem Road by the Calabar International Convention Centre: broken earth before, smooth asphalt after. Before: an unpaved, broken road. After: fresh asphalt with drains along the side.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road ConstructionRoads at the Army, Air Force, Navy and DSS formations, Calabar · CalabarInternal roads at 13 Brigade, the Air Force Base Akim, the Eastern Naval Command and the DSS, asphalted to support the people who keep us safe. 13 Brigade Nigerian Army barracks: internal road asphalted. Air Force Base, Akim: new roads with markings. Headquarters, Eastern Naval Command: asphalt overlay. DSS road safety: resurfaced access road.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road ConstructionPolice Headquarters, Diamond Hill, Calabar · Calabar MunicipalThe State Police Headquarters at Diamond Hill now has paved internal roads and a tidy frontage. Before: a broken, unpaved yard. After: asphalted internal roads with markings and kerbs.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road ConstructionAkim Police Barracks Road, Calabar · Calabar MunicipalAkim Police Barracks Road: from sand and gullies to fresh asphalt. Before: a sandy, eroded road where children walked through gullies. After: a new asphalt road through the barracks area.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road ConstructionMore Calabar streets: Esuk Otu, NNPC Road, Muri–Nta Eke (Efio Ete), Marian Road and others · CalabarStreet after street across Calabar paved: concrete, asphalt and new drains where there was mud. Esuk Otu Street paved. NNPC Road and Marian Road resurfaced. Muri–Nta Eke Road, Efio Ete: a new concrete road. A side street after intervention.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road ConstructionDeputy Governor's Close, Ogoja town · OgojaFrom graded red earth to a finished asphalt street with centre lines and kerbs, right in Ogoja town. Before: a bare laterite track being graded by a loader. After: smooth asphalt with a white centre line. Kerbs and walls lined along both sides.Documented by Evidence Group from official papers2 sources
Completed (date not stated)Road ConstructionIkono Street by Mbukpa Road, Calabar · CalabarIkono Street by Mbukpa Road went from a sandy, rutted lane to a wide asphalt street. Before: sand and ruts between the buildings. After: a wide asphalt street with kerbs.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road ConstructionNyong Edem Street by White House Street, Calabar South · Calabar SouthNyong Edem Street in Calabar South: a muddy, overgrown road before; a clean concrete street after. Before: mud, weeds and broken ground. After: a paved street running between the houses.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road DualisationEsuk Utan Road dualisation, Calabar · Calabar MunicipalEsuk Utan Road dualised: two lanes each way and a central median, easing traffic in Calabar. A dual carriageway with a central median. Open to traffic, with markings and kerbs.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road MaintenanceMurtala Mohammed Highway, Calabar · CalabarThe main highway into Calabar patched, resurfaced and kept in good shape. Crews laying asphalt on the damaged sections. The finished dual carriageway with its planted median.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road RehabilitationWatt Market Roundabout, Calabar · CalabarWatt Market used to flood into potholes. Now the roundabout is rebuilt and dry. During: flooded potholes and broken drains being dug out. After: a smooth, drained road through the market.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road RehabilitationAbakpa Road, Ogoja · OgojaAbakpa road resurfaced. New asphalt with white centre-line and yellow edge markings, cleared shoulders. Smooth asphalt along a tree-lined stretch. Dashed white centre line and solid yellow edge lines. Shoulders cleared on both sides.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road RehabilitationAlifokpa Road, Yala · YalaAlifokpa Road in Yala, before and after: a dusty track turned into a black-top road. Before: red earth with vehicles stuck at the roadside. After: new asphalt across the carriageway.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road RehabilitationUgep town roads: Akang Street, Unebu Lane, Okoi Obla Street, Nko Street, General Hospital Road · YakurrFive streets in Ugep resurfaced with lane markings, including the road to the General Hospital. Akang Street and Unebu Lane: new asphalt with junction markings. Okoi Obla Street: drains built, then asphalted. Nko Street and General Hospital Road resurfaced.Documented by Evidence Group from official papers1 source
Completed (date not stated)Road SafetyTraffic lights, Ogoja · OgojaTraffic lights installed in Ogoja, bringing order and safety to a busy northern town. Signal heads mounted on a new pole at the roadside. Installed beside a paved road with a cleared verge.Documented by Evidence Group from official papers1 source
Under constructionBridge ConstructionAkreha Bridge, Yala · YalaA new bridge rising across the Akreha river in Yala, to link communities that were cut off in the rains. Bridge piers standing in the riverbed. Precast beams on site, ready to be placed.Documented by Evidence Group from official papers1 source
Under constructionRoad ConstructionNkpani Road, Yakurr · YakurrNkpani Road in Yakurr: drains and culverts are going in first, so the new road lasts. Before: a narrow laterite road. Reinforced concrete drains and culverts under construction.Documented by Evidence Group from official papers1 source
Under constructionRoad ConstructionOkoro Agbor Street by Marian, Calabar · CalabarOkoro Agbor Street, a footpath before, is now under construction as a proper road. Before: a grass footpath beside a wall. Under construction: road bed laid with stone base.Documented by Evidence Group from official papers1 source
Under constructionRoad ConstructionYahe–Wanokom (Ukele) Road, Yala · YalaA rutted rural road in Yala is being rebuilt: culverts first, then asphalt. Farmers and traders will move faster and safer. Before: a red laterite road with deep ruts. Concrete culverts and drainage being built. Fresh asphalt laid on the finished stretch.Documented by Evidence Group from official papers1 source
Under constructionRoad ConstructionBoki East-West Road · Boki17km laterite road under construction. First 3km asphalted through forest stretch, with graded shoulders and gravel edging. Before: a red laterite track with deep wheel ruts and loose soil. After, on the finished 3 km: a continuous asphalt surface through dense forest. Graded shoulders on both sides, with gravel edging along the carriageway. The remaining 14 km is still laterite and has not yet been asphalted.Documented by Evidence Group from official papers2 sources
Under constructionRoad ConstructionOban–Nsan Road, Akamkpa · AkamkpaOban–Nsan Road in Akamkpa is being built from scratch, and the first section is already asphalted. The road corridor cleared with heavy equipment. Engineers inspecting reinforced culverts. The first asphalted section, open to traffic.Documented by Evidence Group from official papers1 source
Under constructionRoad ConstructionDSS–Akim Akim Road, Calabar · Calabar MunicipalA new road corridor opened from the DSS area to Akim Akim in Calabar. The road corridor cleared and earthworks under way.Documented by Evidence Group from official papers1 source
Under constructionRoad ConstructionParliamentary Road, Calabar (Phase 1 and Extension) · Calabar MunicipalParliamentary Road Phase 1 is finished as a dual carriageway with streetlights; the extension (Phase 2) is under construction. Before: the extension corridor as bare earth. Phase 1: a completed dual carriageway with streetlights. Phase 2: the extension taking shape.Documented by Evidence Group from official papers1 source
Under constructionRoad ConstructionStadium Road, Ogoja · OgojaStadium Road being asphalted with concrete side drains. Finished stretch has centre-line and edge markings; roller still working further along. Finished stretch: smooth asphalt with a dashed white centre line and white edge lines. Concrete side drains with slab covers at the entrances to roadside shops. Grassed verge on the finished section. Work in progress: fresh asphalt being compacted by a road roller, with workers on site. A new side drain still open beside the freshly laid surface.Documented by Evidence Group from official papers2 sources
Under constructionRoad ConstructionAdiabo–Eseku Road, Odukpani · OdukpaniA new road being cut through Adiabo to Eseku, opening up farms and fishing communities. Before: a swampy track through palm bush. The road corridor cleared, filled and compacted.Documented by Evidence Group from official papers1 source
Under constructionRoad RehabilitationOld Bank Road, Ikom town · IkomOld Bank Road in Ikom town is being graded and rebuilt. The road bed being graded and levelled for the new surface.Documented by Evidence Group from official papers1 source